The 10 latest Working Groups created:
- TOR-JWG D2_C6.47_Advanced Consumer-Side Energy-Resource Management Systems (pdf, 151kB)
- TOR-WG C2.40_TSO-DSO Co-Operation – Control Centre Tools Requirements (pdf, 196kB)
- TOR-WG C2.25_Operating Strategies and Preparedness for System Operational Resilience (pdf, 239kB)
- TOR-WG A1.63_Turbo Generator Stator Winding Bushings and Lead Connections – Field Experience, Failures and Design Improvements (pdf, 263kB)
- TOR-WG C3.09_Sustainable corridor management (pdf, 456kB)
- TOR-WG A1.62_Thrust Bearings for Hydropower – A Survey of Known Problems and Root Causes (pdf, 225kB)
- TOR-WG D1.72_Test of material resistance against surface arcing under DC (pdf, 75kB)
- TOR JWG B5_D2.67_Time in Communication Networks, Protection and Control Applications – (pdf, 508kB)
- TOR WG B5.65_Enhancing Protection System Performance by Optimising the Response (pdf, 453kB)
- TOR-WG B3.51 Service continuity guide for the maintenance, repair and extension of HV GIS (pdf, 73kB)
XIV Sepope – Symposium of Specialists in Operation Planning and Electrical Expansion
30/09/2018 – 03/10/2018
Recife, Brazil